A fibre cable in the customer connection node in Paris has broken. No impact on traffic expected. We will open a ticket with the fibre-optic network operator.
Update(s):
Date: 2014-07-14 11:28:36 UTC A fiber cable in the in the Robert Keller customer connection node was constrained. The technician intervened and security os once again operational.
Date: 2014-07-14 08:20:52 UTC The issue has been repaired but there is a loss of 3dB. We will ask the operator to improve the output.
Date: 2014-07-14 05:56:44 UTC The cut-off was detected 600m from Robert Keller - RKE75.
Because of July 14th,the zone is closed. Reparations can not be performed until Monday evening or Tuesday morning.
Security is operational.
Date: 2014-07-11 09:38:57 UTC The cut-off is located between the RKE75 and CEV75 sites.
A ticket has been opened with the fibre-optic network operator.